Marston's Brewery - Gallery
Jump to navigation
Jump to search
Return to Marston, Thompson & Evershed Ltd
-
Pub wall plaque at the Visitor Centre
-
2006 advertising campaign
-
The Marston core cask beer range
-
Pedigree pump clip
-
Pedigree bottle and glass
-
Curtain sided trailers in the brewery yard
-
Copper on the boil with the then Coors malting tower in the background
-
The front face of the old fermenting block in 2004
-
The front face of the old fermenting block, now the new brewhouse in 2006
-
Roof apex with decoration
-
A reminder that London's Mann, Crossman and Paulin owned the brewery from 1875 to 1896.
-
View of the brewery from the extensive yard
-
Brewery stack
-
A posh oak door
-
English Heritage insisted a window blocked up in the 1960s was reinstated
-
Visitor Centre entrance
-
Three boilers dating from 1998
-
One of the old coppers
-
Three of the old coppers
-
Inside one of the old mash tuns
-
The old malt mill
-
Three 400hL coppers are heated by external boilers
-
Two 15 tonne mash tuns at 7m diameter. Brewhouse came from RMDG in 1985 and was installed at Mansfield Brewery
-
Decoration between two coppers
-
Steels masher
-
The grist cases had to be cut to 13 tonnes to fit the existing building
-
You have been warned!
-
The roof trusses had to be preserved so there is an expensive kink in the copper vents
-
The feed to the copper for syrup addition and a CIP link
-
Another view of the roof
-
Weak wort recycling tanks
-
Hop separator
-
Two wort heat exchangers
-
Union set swans neck
-
The transverse feeder trough
-
7hL casks showing the attemperator water loops and the feeder arm at the top
-
The bottom tap and emptying trough. The plastic bag reduces fobbing
-
View of six 100brl union sets.
-
There are 28 skimmers sited at either side
-
View of an end cask and the feeder trough
-
Fermentation in full flow
-
View between the union sets
-
More detail of the cask heads
-
The top trough
-
A Microdat automatic deshiver and dekeystoner in the cask racking hall
-
Cask racking range
-
KHS 80 head filler works at 700bph
-
Bottle conveyors with the tunnel pasteuriser on the left
-
The new brewhouse forced the removal of some old vessels
-
Old double union set No2 and 3 was dismantled and is in store
-
27 wood and cast iron vessels with stainless liners on the top floor and a further 16 below did not survive
-
In 2014, a new £7.4m bottling line was installed. Here is the incoming bottle depalletiser
-
KHS 48/84/16 monobloc rinser/filler/crowner
-
Sterile filtration
-
Equipment to inject bottle conditioning yeast
-
Pallet wrapping
-
Robotic layer assembler
-
Emma Gilliland is Group Packaging Manager
-
Head Brewer Steve Brooks with Fergy's Fury after Burton Albion held the mighty Manchester United to a goalless draw.
-
Head Brewers rarely feature in company promotions