Trossachs Craft Brewery: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 4: | Line 4: | ||
Brewing was suspended during 2005, with production transferred to Stirling Brewery. | Brewing was suspended during 2005, with production transferred to Stirling Brewery. | ||
[[category:Scotland]] |
Revision as of 11:51, 21 September 2018
Trossachs Craft Brewery, The Lade Inn, Kilmahog, Callander, Central.
Brewing commenced 2003.
Brewing was suspended during 2005, with production transferred to Stirling Brewery.