St Austell Brewery - 17 August 2010: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
m (Bhadmin moved page St Austell Brewery - Gallery 17 August 2010 to St Austell Brewery - 17 August 2010 without leaving a redirect) |
||
(2 intermediate revisions by 2 users not shown) | |||
Line 41: | Line 41: | ||
File:50 -0816.JPG | Crown elevator | File:50 -0816.JPG | Crown elevator | ||
File:51 -0817.JPG | Shrinkwrap end of the tray and shrink machine | File:51 -0817.JPG | Shrinkwrap end of the tray and shrink machine | ||
File:52 -0821.JPG | | File:52 -0821.JPG | Pre-erected trays | ||
File:53 -0823.JPG | A turntable for stretchwrapping | File:53 -0823.JPG | A turntable for stretchwrapping | ||
File:60 -1914.JPG | Loading casks for the St Columb depot 12 miles away | File:60 -1914.JPG | Loading casks for the St Columb depot 12 miles away |
Latest revision as of 15:38, 30 April 2023
Return to St Austell Brewery Co. Ltd