Adnams plc - Gallery 26 June 2001: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 22: | Line 22: | ||
File:newcip.jpg|New CIP plant by Industrial Techniques | File:newcip.jpg|New CIP plant by Industrial Techniques | ||
File:newend1.jpg|View of the recently commissioned fermenting room | File:newend1.jpg|View of the recently commissioned fermenting room | ||
File:newend2.jpg|You would never guess there were nine new | File:newend2.jpg|You would never guess there were nine new 250brl fermenters behind this façade | ||
File:newfv inspection.jpg|New vessels by Briggs | File:newfv inspection.jpg|New vessels by Briggs | ||
File:newfv room.jpg|The new vessels are set in three rows of three | File:newfv room.jpg|The new vessels are set in three rows of three | ||
File:newloop1.jpg|Each vessel has a continuously pumped sample loop | File:newloop1.jpg|Each vessel has a continuously pumped sample loop which comes out at the pump | ||
File:newloop2.jpg|This is the microbiological sample point | File:newloop2.jpg|This is the microbiological sample point | ||
File:newloop3.jpg|This is the bulk sampling point | File:newloop3.jpg|This is the bulk sampling point | ||
File:newloop4.jpg|The flow of liquid | File:newloop4.jpg|The flow of liquid re-enters the vessel just above outlet. | ||
File:newsudmo1.jpg|Valve stations between the vessel rows | File:newsudmo1.jpg|Valve stations between the vessel rows | ||
File:newsudmo2.jpg|A few of the 156 Sudmo valves used in the new FV project | File:newsudmo2.jpg|A few of the 156 Sudmo valves used in the new FV project |